Garments Finishing
Garments finishing is a very important section of the RMG sector. Its last section for garments manufacturing. The section can be improved quality of garments. finishing section can be added value to the product which attracts the customer.
Sr. Executive
Production Officer
Shift In-charge
The floor in- charge
Line Chief
Supervisor
Operator
Labour
Organogram of Finishing:
Production GM
Helper
Garments Finishing Section.
Finishing Flow Chart:
The finishing flow chart is very dependable on the layout of the production line and the product that is needed. It can be very factory to factory and product to product. Here It is:-
Input
Size check
Sade check
Thread sucker
All tag attached
Tag check
Initial iron
Quality check
Sent body to get up check
Body Inspection
Iron
Metal check
Folding
Assorting
Poly or Packaging
Carton
Final Inspection
In-Store
Shipment
Garments
Input (color, size & style-wise): In this stage, the body comes from the sewing section by way of per
color, style or size to finishing section as an input.
Thread Sucking: Here finishing input is brought in
touch of thread sucking machine to remove the loose thread from the body.
Initial Iron: In this stage, garments are being
ironed and close all the button of the garments for helping further step
easier.
Quality Check: Here body is inspected by a quality inspection to check if
there any swing, washing, or any other faults that exist in the garments. If found,
the garments are sent to the repair section or defective garments are declared
as reject. Here 100% quality check is done.
Sends the body to get Up change: In this stage, an inspector ensures
the garments get up is okay or not.
Body inspection: An inspection randomly inspection
some number of garments to ensure the measurement is correct or not, quality
checking has been done properly or not, initial ironing as per requirements or
not.
Iron: Here, garments are ironed properly
for folding as per buyer‟s requirements.
Folding: After the ironing of the garments,
the garments are being folded in the way buyer direction.
Accessories Attachment: Here, accessories like hang tag,
security tag, collar stand, butterfly, etc. are attached before poly the
garments.
Poly: In this stage, garments are being
poly to protect the garments from dust as well as to ensure the garments be
safe in the cartoon.
Cartoon: According to the packing list, after
being poly the garments, garments are being cartooned for shipment.
Shipment: Garments inspection is passed, the
garments are ready for shipment.
In Finishing section Ironing and Quality Inspection
Department:
Major work
done on this department:
- Ironing
- Spot Removing
- Quality Check
- Sewing Check
- Printing Check
- Label Check
- Size Label Check
- Measurement Check
- Final Inspection before Packing
List
of major defects found in the finishing section:
- All labels missing.
- Uncut Sewing Thread.
- Wrong color.
- Hole in fabric Damage
- Conspicuous repair
- Poor construction
- Conspicuous silage. (inside or outside)
- Conspicuous abrasion marks from the wash process
- High/ low pockets
- Buttons, snap defect
- Button hole raveling.
- Incomplete not cut properly
- Miss aligned
- Sizing problem
- Poorly trimmed garments threads
- Broken stitches
- Skipped stitches
- Open seam
Remark: The finishing Section act as the finisher of the garments manufacturing. It's one part of RMG.
Appendix:
RMG- Ready mate Garment.
AQL- Acceptable Quality label.


1 Comments
Its very help an usefully post. Thanks. We want to see more post.
ReplyDelete